Projects

Joker Marchant Stadium

Lakeland, FL

Overview

Detroit Tiger Spring Training has been part of Lakeland history since 1966.  Fans and players are now experiencing the games in a recently renovated stadium, which includes a new clubhouse and an addition to the existing stadium. Increased seating and an observation deck offers new vantage points for fans to cheer on their teams.

KHS&S work included cold formed metal framing (CFMF), steel roof deck, exterior/interior metal framing, exterior sheathing and vapor barrier, stucco, drywall, fiberglass reinforced panels (FRP) and acoustical ceilings. The $41 million project was completed in March 2017.

SERVICES PROVIDED

  • Cold-formed metal framing (CFMF)
  • Steel roof deck
  • Exterior/interior metal framing
  • Exterior sheathing and vapor barrier
  • Stucco
  • Drywall
  • Fiberglass reinforced panels (FRP)
  • Acoustical ceilings

AWARDS

  • ABC Excellence in Construction Subcontractor of the Year (2019)