Projects

Disney’s Polynesian Village Resort

Walt Disney World Resort, Orlando, FL

Overview

KHS&S embodied the spirit of Kina’ole, a devotion to excellence, on the Disney’s Polynesian Village Resort project.

KHS&S craftsmen performed multiple scopes of interior and exterior construction to modernize the iconic resort while maintaining consistency with the Polynesian-inspired theme that has captivated guests since its opening in 1971.

KHS&S completed work in three areas of the project: 1) renovation of the Great Ceremonial House; 2) construction of the new over-water bungalows; 3) conversion of 248 existing guest suites (located in three existing guest buildings) into Disney Vacation Club deluxe studios.

SERVICES PROVIDED

Interiors
metal studs, building insulation, firestopping, hollow metal door frames, access doors, interior metal support systems, drywall, shaft wall systems and theming, acoustical ceilings, bamboo panels, carpentry

Exteriors
Truss systems, decking, structural steel, heavy timber entry canopies, heavy timber balcony columns, cedar balcony, exterior sheathing, theming

AWARDS

  • ABC Excellence in Construction Award of Merit (2015)