Amalie Arena Transformation

Tampa, Florida

PROJECT PROFILES


Amalie Arena Transformation Tampa, Florida

Description

KHS&S was part of the Mortenson Construction team that completed a $25 million renovation of downtown Tampa’s Amalie Arena in just three months. Flexibility and experience in Lean Construction processes helped KHS&S overcome frequent work disruptions and a condensed construction schedule to deliver multiple interior scopes of work for the 78,090-square-foot Amalie Arena 2015 Transformation.

Services Provided

The transformation focused on fan-facing upgrades, including reconstruction of an entire club level to be more modern and exclusive. Specifically, KHS&S’ scope of work included:

• Reforming and rebuilding the metal stud framing for seating in the club level

• Structural framing for the new 140-seat Loge area

• Metal framing for seating, concessions, locker rooms and performer area

• Hollow metal door frames and access doors

• Shaft wall systems and fire stoppage

• Gypsum board finishing and insulation

Images

Interiors

Exteriors

Services


Awards

  • ABC Excellence in Construction Award of Merit(2017)